IS410 Prepreg 2022 Supplemental

IS410 Prepreg 2022 Supplemental

27 September 2022

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Isola at IPC APEX EXPO and DesignCon Conferences Jan. 29 – 31
Materials Meet Needs Of Millimeter Wave AIppich
Materials Meet Needs of Millimeter-Wave 5G Small Cells
  Fifth Generation (5G) networks offer extensive wireless services with even faster data rates to come. Most of the systems have been based on signals below 6 GHz. Once network coverage has been achieved at higher, millimeter-wave (mmWave) frequencies of 24 GHz and higher,…