Categories

Media Contact:
news@isola-group.com

Isola 2019 Fact Sheet

New Isola Facility

PCB007 Interview with Travis Kelly: Maintaining Continuity of Supply

- Interviews

On April 9, Barry Matties spoke with Travis Kelly, Isola president and CEO. Travis gave an update on Isola’s responses to the COVID-19 challenges in materials manufacturing.

Travis pointed out that Isola’s products fill a critical need in the switch to medical equipment manufacturing for ventilators and related products. He also spoke to the three keys to maintaining continuity of supply.

ISOLA ANNOUNCES NEW HEADQUARTERS LOCATION IN CHANDLER WITH 118,000 SQUARE FOOT LEASE

- News

Chandler, Arizona, (August 27, 2019):
Isola Group has completed a 118,000-square-foot lease to remain in Chandler and relocate its Corporate Offices, R&D and manufacturing operations. The company will be moving the Corporate Offices on October 7th, 2019 into a newly constructed industrial building at the Lotus Project, which is located near Kyrene Road and Loop 202 at 6565 West Frye Road, Chandler AZ 85226.

Isola Group is a market leader in copper-clad laminates and dielectric prepreg materials used to fabricate advanced multilayer printed circuit boards (PCBs). The new state-of-the-art facility will be optimized for the quick-turn PCB market that drives much of the product innovation in North America.