A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Isola Group Displays Materials for Mixed-Signal Solutions at 2022 EuMW
Isola Group has long been a supplier of high-performance circuit materials for both high-frequency RF/microwave and high-speed-digital (HSD) circuits. And, as visitors to the upcoming 2022 European Microwave (EuMW) Exhibition will find out, those different materials can be processed at the same temperatures and…
Huizhou Voids Team Wins First Prize in China Lean Contest
The Lean event was represented by participants and experts from the automotive, electronics, medical and other manufacturing industries throughout China. The journey to the prestigious December event was not easy, but the Isola Huizhou team found the way by winning the top prize from the…