RF / Microwave

RF / Microwave

04 November 2020

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
IMG 2789
Singapore: Isola announces the grand opening of their new sales office and Analytical Services Laboratory.
On June 18 the Singapore Isola and JSL team celebrated the opening of their new offices. Photos show the ribbon cutting and a photo of the Isola and JSL team.
Isostack Tool Help – Right Panel
Check to select frequencies to calculate impedance. Check to highlight the copper layer of interest. Uncheck reference check box to designate a signal layer. By default, all layers are treated as a reference plane. 4. A ‘green’…