A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
PCB Materials Pave the Way to Faster, Higher-Frequency Circuits
Designers looking to trim losses, size, and weight from high-speed, high-frequency printed-circuit boards (PCBs) will want to visit Isola Group in Booth #5090 at IMS2022. There, the company will display an array of its advanced circuit materials, which are formulated for low…
Global material sciences company, Isola, names Travis Kelly President and CEO
FOR IMMEDIATE RELEASE CHANDLER, Ariz. – Isola, designer and developer of copper-clad laminates and fabrication materials for multi-layer printed circuit boards (PCBs), has appointed Travis Kelly president and chief executive officer. Kelly most recently served as global chief operating officer at Cerberus Operations and Advisory…