Enabling Lower Cost Advanced Automotive Safety Systems Through Hybrid PCB Construction Isola
30 December 2015
Related Posts
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
PCB Materials Pave the Way to Faster, Higher-Frequency Circuits
Designers looking to trim losses, size, and weight from high-speed, high-frequency printed-circuit boards (PCBs) will want to visit Isola Group in Booth #5090 at IMS2022. There, the company will display an array of its advanced circuit materials, which are formulated for low…
Isola is headed to San Jose for the DesignCon tradeshow this month. Stop by our booth to chat with us! San José McEnery Convention Center Address: 300 Almaden Blvd, San Jose, CA 95110 Booth: 925…