FR408HR Laminate SDS 2020.07.19

FR408HR Laminate SDS 2020.07.19

22 January 2024

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Isola Changing With Times
Isola Changing With the Times
Changing market conditions require changes in approach. I-Connect007’s Barry Matties and Nolan Johnson speak with Isola’s Travis Kelly, Sean Mirshafiei, and Kirk Thompson about Isola’s recent responses to market conditions. In this interview, Kelly, Mirshafiei and Thompson outline recent changes to Isola senior leadership, optimizing…
PCB007 Interview with Travis Kelly: Isola Responding to the Market
PCB007 Interview with Travis Kelly: Isola Responding to the Market
Feature Interview by the I-Connect Editorial Team in July, 2021. Interview with Isola’s Travis Kelly overviewing many the important topics that the industry is facing, like how the global supply chain is being strained by materials, and what companies are trying to do to…