A Tour of the New Isola Factory: Investing in America
https://www.isola-group.com/wp-content/uploads/home_hero.mp4 I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team persevered and the…
The Importance of Circuit Board Material for Millimeter-wave Circuits
https://www.isola-group.com/wp-content/uploads/home_hero.mp4 Growing demands for higher data rates and real-time video require wide bandwidths that are only available at 24 GHz and above. This calls for more than simple network infrastructure additions or modifications as the shorter wavelengths at these frequencies propagate over shorter distances than at microwave frequencies. For…
ISOLA ANNOUNCES NEW HEADQUARTERS LOCATION IN CHANDLER WITH 118,000 SQUARE FOOT LEASE
https://www.isola-group.com/wp-content/uploads/home_hero.mp4 Chandler, Arizona, (August 27, 2019): Isola Group has completed a 118,000-square-foot lease to remain in Chandler and relocate its Corporate Offices, R&D and manufacturing operations. The company will be moving the Corporate Offices on October 7th, 2019 into a newly constructed industrial building at the Lotus Project,…