Materials Meet Needs of Millimeter-Wave 5G Small Cells

Materials Meet Needs of Millimeter-Wave 5G Small Cells

02 November 2022

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Eumw Promo Milan2
Isola Group Displays Materials for Mixed-Signal Solutions at 2022 EuMW
Isola Group has long been a supplier of high-performance circuit materials for both high-frequency RF/microwave and high-speed-digital (HSD) circuits. And, as visitors to the upcoming 2022 European Microwave (EuMW) Exhibition will find out, those different materials can be processed at the same temperatures and…
New Isola Analytical Laboratory 062020
Isola Opens Expanded R&D and Analytical Laboratory at New Global Headquarters & Manufacturing Facility
CHANDLER, Ariz. – Isola, designer and developer of copper-clad laminates and fabrication materials for multi-layer printed circuit boards (PCBs), has a new facility in the Phoenix Valley. Isola’s R&D and Analytical Laboratory has officially opened the company’s new global headquarters in Chandler, Ariz. Nearly…