Materials Meet Needs Of Millimeter Wave AIppich

Materials Meet Needs Of Millimeter Wave AIppich

02 November 2022

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Isola at IPC APEX EXPO and DesignCon Conferences Jan. 29 – 31
Travis Interview
PCB007 Interview with Travis Kelly: Maintaining Continuity of Supply
On April 9, Barry Matties spoke with Travis Kelly, Isola president and CEO. Travis gave an update on Isola’s responses to the COVID-19 challenges in materials manufacturing. Travis discusses how Isola is managing their supply chain by leveraging our global footprint to to fulfill increasing…