IS420.dk.prepreg

IS420.dk.prepreg

16 December 2020

Related Posts

Isola Changing With Times
Isola Changing With the Times
Changing market conditions require changes in approach. I-Connect007’s Barry Matties and Nolan Johnson speak with Isola’s Travis Kelly, Sean Mirshafiei, and Kirk Thompson about Isola’s recent responses to market conditions. In this interview, Kelly, Mirshafiei and Thompson outline recent changes to Isola senior leadership, optimizing…
Managing Materials For MmWave Circuits AlexIppich
The Importance of Circuit Board Material for Millimeter-wave Circuits
Growing demands for higher data rates and real-time video require wide bandwidths that are only available at 24 GHz and above. This calls for more than simple network infrastructure additions or modifications as the shorter wavelengths at these frequencies propagate over shorter distances than at…
A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…