A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Isola Encourages Higher-Frequency Circuits with Practical Material Solutions at 2023 IMS
Isola Group is inviting the RF/microwave industry to find more practical circuit material solutions at the upcoming 2023 IEEE International Microwave Symposium (IMS) exhibition. Welcoming visitors to the San Diego Convention Center (San Diego, CA) for the industry’s largest annual RF/microwave conference and exhibition…
Check to select frequencies to calculate impedance. Check to highlight the copper layer of interest. Uncheck reference check box to designate a signal layer. By default, all layers are treated as a reference plane. 4. A ‘green’…