1080×720

1080x720

29 October 2020

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
DesignCon Announcement
Isola is attending DesignCon 2021
Isola is headed to San Jose for the DesignCon tradeshow this month. Stop by our booth to chat with us! San José McEnery Convention Center Address: 300 Almaden Blvd, San Jose, CA 95110 Booth: 925…
Signal Integrity Logo (1)
Jeff Waters Interviewed by Signal Integrity
Signal Integrity Journal recently caught up with Jeff Waters to check in on his progress over the last two years since he took over as president and CEO of Isola Group discussing improvements in their operations and new products.