IStock 1132031413

23 November 2020

Related Posts

New Building Architectural Rendering (Lotus)
ISOLA ANNOUNCES NEW HEADQUARTERS LOCATION IN CHANDLER WITH 118,000 SQUARE FOOT LEASE
https://www.isola-group.com/wp-content/uploads/iStock-1132031413.mp4 Chandler, Arizona, (August 27, 2019): Isola Group has completed a 118,000-square-foot lease to remain in Chandler and relocate its Corporate Offices, R&D and manufacturing operations. The company will be moving the Corporate Offices on October 7th, 2019 into a newly constructed industrial building at the Lotus Project,…
These Circuit Materials Are Paving the Way to 6G
5G is Setting Stage for 6G
https://www.isola-group.com/wp-content/uploads/iStock-1132031413.mp4 It seems like only yesterday, but Fifth Generation (5G) cellular networks have been making wireless connections for almost four years. Already, some of the major carriers and test-equipment developers are looking ahead to around 2029 or 2030 and the expected start of Sixth Generation (6G) networks. Still, 5G…
A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
https://www.isola-group.com/wp-content/uploads/iStock-1132031413.mp4 I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team persevered and the…