Fr406n

Fr406n

08 December 2020

Related Posts

A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team…
Probing Materials for Millimeter-Wave PCBs
Probing Materials for Millimeter-Wave PCBs
Analog frequencies and digital data rates are increasing steadily in electronic circuits and systems, requiring careful choices of circuit materials for printed circuit boards (PCBs). Cellular communications technologies grew by means of RF and microwave signal frequencies, but Fifth Generation (5G) cellular wireless networks are…
Isola Eumw 2023
Isola Group’s Materials Channel Millimeter Waves at 2023 EuMW
Isola Group (www.isola-group.com) is a long-time supplier of dependable materials for high-speed-digital (HSD), RF and microwave circuits and, increasingly, for millimeter-wave circuits. Isola’s representatives will be on hand to welcome visitors to their booth #326C at the upcoming 2023 European Microwave (EuMW) Exhibition…