Isostack Tool Help – Central Panel

  1. When multiple resins systems are used, a hybrid notification will appear.
  2. Checking the shield or mask check box will add surface finish and soldermask to the outer layers.
  3. Units in mils, mm and µm can be selected.
  4. The Zoom function will compress the stack up to reduce scroll distance.
  5. Clicking the red ‘ will add an HDI layer (prepreg and foil). Clicking the blue‘ will add an additional inner layer (core and prepreg).
  6. Clicking the blue‘ will remove the HDI layer (prepreg and foil). Clicking the red‘ will remove the inner layer (core and prepreg).
  7. The yellow warning bar indicates the prepreg is too thin and glass stop may occur.
  8. Left clicking a copper, prepreg or core layer will bring up a window to edit layer properties.
  9. Use ‘Contact Us’ for additional help.

16 July 2021

Related Posts

5G Suitable Laminate and Prepreg Materials | Isola Groupcement
Isola’s Role in the Deployment of 5G
By now just about everyone has heard about 5G in commercials or on billboards but you may be wondering what it means for printed circuit boards and the materials available from Isola?   5G stands for the 5th generation wireless standard. 5G brings brings faster mobile internet speeds to market…
New Isola Analytical Laboratory 062020
Isola Opens Expanded R&D and Analytical Laboratory at New Global Headquarters & Manufacturing Facility
CHANDLER, Ariz. – Isola, designer and developer of copper-clad laminates and fabrication materials for multi-layer printed circuit boards (PCBs), has a new facility in the Phoenix Valley. Isola’s R&D and Analytical Laboratory has officially opened the company’s new global headquarters in Chandler, Ariz. Nearly doubling the size and capacity…
A Tour of the New Isola Factory: Investing in North America
A Tour of the New Isola Factory: Investing in America
I recently toured Isola’s new 118,000-squarefoot low-volume, high-mix manufacturing facility in Chandler, Arizona. The facility’s construction began in 2020 and, like many building projects, was delayed because of the COVID19 pandemic. Building a new factory during the pandemic was certainly a challenge but the team persevered and the new greenfield…